Oliveira & Costa entrusts to Terawatt the new project in Alvalade
Terawatt was selected to perform the electrical installation of the Multiperfil Clinic processing station of medium and low voltage, located in the district of Alvalade, in Angola.
Execution and sectioning of processing station with 1000 kVA/15 kV and respective supply to the general framework of the building installation.
This choice, symbolizes the confidence and the appropriate tailored solutions to each client’s companies developed by Terawatt.