-
Peskwanza
Supply and installation of an 800 Kvas electrogenous group.
See more »
Tests and final testing for launching the generator group system.
Supply and assembly of electrical switchboards, cableways and power cables. -
Baía Building
Supply and installation of two 1000 Kvas electrogenous group. Supply of stainless gas exhaust pipelines with isolation from the second floor up to the cover on the 25th floor.
Design and implementation of a filtering system and exhaust gas purification of the generators. Design and implementation of an automatic filtering system, fuel storage and transfer (20m3)
See more » -
Cominder